A construction contract is an agreement between a client and a contractor that specifies the details of a construction project. The details in the construction contract should cover all aspects of the project including payment, type of work to be done, contractor's legal rights and so on.
CONSTRUCTION AGREEMENT
This Construction Agreement executed at Chennai on … ……MM/YYYY…
BETWEEN
“M/s……Builder Company Name…….” having its office at …………………..Address……………,
represented by its Partner……………., S/o.Mr …………., aged about ….. years residing
at ………………………………. hereinafter called as “BUILDER”.
AND
Mr………………., S/o. ………………., aged
about ….. years, residing at …………………………………. hereinafter called the “OWNER”.
The Builder and the Owner are collectively referred as “Parties”.
1. Description of Work:
Construction of the Residential Project as per the
specifications (more particularly described in Appendix I of this Agreement)
and according to the approved plans and designs as per the drawings annexed as Appendix
IV of this agreement.
2. Scope and Specifications of Work:
The scope of work is described
as per Appendix III and specification of work is described as per Appendix
I. Any change in the specifications as necessitated due to site conditions
will be mutually agreed upon in writing between the Parties. The BUILDER has accepted and agreed to use the Preferred
makes (as and when informed by the OWNERS at each stage of the construction)
for the construction of the above facility.
3. Contract Price:
The total construction price
is Rs. 62,04,900 /- (Rupees Sixty Two Lakhs four Thousand and nine hundred
only) plus GST @ 18% agreed by parties. The contractor agrees to share the GST
input credit benefit with the owner at the end of the project as a discount.
The cost of Construction tractions is agreed as under:
G.Floor-1053
Sft, F.Floor-1046 Sft & S.Floor- 960 Sft, Terrace- 123 Sft |
3182 Sft. x
Rs.1950/- |
62,04,900.00 |
Total |
62,04,900.00 |
|
Goods
service Tax 18% |
11,16,882.00 |
|
Total |
73,21,782.00 |
ADDITIONAL WORK at extra cost are as follows:
2. Main gate work as per Architecture design. (Approx 2,00,000/-)
3. Set back soil filling as per measurement at the site. (Approx 30,000/-)
4. Elevation and Glass work as per architecture design extra cost. (2,00,000/-)
5. Interior and wood work.
6. Approval charges, Patta charges etc (1,25,000/-)
7. Borewell charges (1,25,000/-)
8. EB charges for the construction
9. Compound wall 90Rft @ Rs.1900 per RFT ( Approx 1,71,000/-)
10. RCC Water sump 12k L @ Rs.28 per Liters (Approx 3,36,000/-)
11. RCC septic tank 5k L @ Rs.22 per Liters (Approx 1,10,000/-)
12. Overhead tank 5k L @ 25 per liters (Approx 1,25,000/-)
4. Project Timelines
4.1 The BUILDER hereby
acknowledged that time is the essence of the Contract and that it shall complete all the works specified in Appendix 2 within 12
-15 months from the date of this
Agreement subject to force majeure conditions. To this end, the BUILDER agrees to
conform to the timelines specified in Appendix 2 herein below.
5. Payments Schedule:
The PARTIES agree to the
following payment schedule.
The OWNER shall pay the total
amount Rs.62,04,900.00/- (Rupees Sixty
Two Lakhs four Thousand and nine
hundred only) in 5 instalments in the following manner:
1. A sum of Rs.15,51,225/-
(Rupees Fifteen Lakhs Fifty One Thousand Two hundred twenty-five only) plus GST
a sum equivalent to 25% of the total estimate as the initial amount to be paid by the owner on the signing of the contracting agreement.
2. A sum of Rs.11,63,419/-
(Rupees Eleven Lakhs sixty-three thousand four hundred and nineteen only) plus
GST a sum equivalent to 18.75% of total estimate as running bill payment to be
paid by the Owner on completion of Ground Floor Roof slab.
3. A sum of Rs.11,63,419/-
(Rupees Eleven Lakhs sixty-three thousand four hundred and nineteen only) plus
GST a sum equivalent to 18.75% of total estimate as running bill payment to be
paid by the Owner on completion of First Floor & Second Roof slab.
4. A sum of Rs.11,63,419/-
(Rupees Eleven Lakhs sixty-three thousand four hundred and nineteen only) plus
GST a sum equivalent to 18.75% of total estimate as running bill payment to be
paid by the Owner on completion of Brickwork & Plastering works.
5. A sum of Rs.11,63,419/-
(Rupees Eleven Lakhs sixty-three thousand four hundred and nineteen only) plus
GST a sum equivalent to 18.75% total estimate as advance to be paid by the
owner for Ground Floor, First floor & Second Floor Tile, Electrical &
Painting work.
6. Additional works payment
(as listed in List 3) to be made as and when the particular works
commenced.
6. Facilities at Site:
The OWNERS agree to provide
sufficient space for construction of labour shed to accommodate the labourers
at site, the water at one point and electricity required for construction to be
provided by Owners. The cost of construction of labour shed shall be borne by
the BUILDER.
7. Mobilization and
Material Advance:
The OWNERS agree to release a
lump sum amount of Rs.15,51,225/- (Rupees Fifteen Lakhs Fifty One Thousand Two
hundred twenty-five only) plus GST as agreed in Clause
5.1 above towards mobilization
advance and advance for procurement of steel required for this project to the
BUILDER on the signing of this Contract agreement.
8. No assignment or
subletting of Contract:
The Builder shall not without
the written consent of the OWNERS assign or sublet this contract.
9. Indemnity by
Builder:
The BUILDER shall be liable
for, and shall indemnify the OWNERS against any liability, loss, claim or
proceedings whatsoever arising under any statute or at common law in respect of
any damage to any property or in respect of
personal injury to or the death of any person whomsoever arising out of or in the course of or
caused by the carrying out of the works.
11. Insurance:
The BUILDER agrees to provide
insurance cover to the workmen deployed by it for the purposes of this
Agreement, under the Workmen Compensation Policy from the effective date of work until
the project completion. The costs for the same shall be borne exclusively by
the BUILDER.
12. Safety &
Preventive Measures:
All safety norms/standards and
preventive measures for the works shall be strictly followed by the BUILDER.
The BUILDER shall provide his workers with the necessary safety equipment to
avoid any accident during the contract period.
13. Right to appoint
sub-contractors:
Notwithstanding anything
contained hereinbefore the BUILDER will be entitled to appoint one or more
sub-contractors either for supplying labour or buying material or for
construction of any work but the contracts entered by the BUILDER with
subcontractors will be subject to this contract and there will be no privacy
between the
OWNERS and Sub-Contractor and
the BUILDER will be liable and responsible for the acts of omission or
commission of the sub-contractor as if they are their own acts.
14. Event of Default
and Termination:
Any of the following shall
constitute an event of default by the Developer:
1. BUILDER has been or is in
the process of being liquidated, dissolved, wound-up, amalgamated or
reconstituted in the manner that would in the opinion of the OWNERS have a material adverse effect on the Project;
2. If any representation made or
warranties given by BUILDER under this Agreement is found to be false or
misleading.
3. If BUILDER breaches any
terms and conditions of this Agreement.
4. If BUILDER has abandoned
any part of its scope of work.
5. The progress of work by
BUILDER is so slow that it will not be able to meet the timeline specified in
the Agreement, including the grace period mentioned. herein, for
completion of the Project; and
6. Notwithstanding anything
contained anywhere, it is explicitly agreed between the Parties that this
Agreement cannot be terminated unilaterally by the BUILDER at any point of
time.
15. Consequences of
Termination:
In the event of termination,
1. the BUILDER shall vacate
the OWNERS Land and hand over the same on an as is where is basis and shall, at
the discretion of the OWNERS, remove any building materials from the premises
of the Owner Land.
2. the BUILDER shall settle
any and all claims, dues or other charges of the employees, workmen or
Sub-Contractors.
3 If construction not
completed, the BUILDER shall be solely responsible in respect of the settlement
of dues and any claims by the Sub-Contracts or other persons employed herein,
the Purchasers or any other persons.
16. Miscellaneous:
16.1 Arbitration:
16.1.1 Any dispute(s) arising
between the Parties under this Construction Agreement shall be settled in
accordance with Arbitration & Conciliation Amendment Act, 2015 of India.
16.1.2 The Parties agree that
the arbitral tribunal shall comprise of a single arbitrator to be
appointed by the Parties.
16.1.3 The place of
arbitration shall be at Chennai and the Parties agree that only the courts of
competent jurisdiction located in Chennai may be approached as regards any and
all aspects of this Construction Agreement.
16.2 The Appendices annexed to this agreement form
an integral part of this Construction Agreement and the terms and conditions
specified therein shall be read as part and parcel of this Construction
Agreement.
IN WITNESS WHEREOF the parties
have put their hands the day and year first hereinabove written.
WITNESS:
1)
2)
Appendix 1 –
Description of the Work:
Name of Work: Proposed
construction of residential building Ground, First & Second Floor at Plot ……………………………….
Appendix 2 – Stages of
Work and Time Lines:
1) Foundation 30 days;
2) Foundation and basement up to Roof Level column 30 days;
3) Ground Floor Roof slab 30
days;
4) First Floor Roof slab 30
days;
5) Second floor Roof slab 30
Days;
6) Ground Floor, First Floor
& Second-floor Brickwork 75 days;
7) Ground Floor, First Floor
& Second-floor Plastering work 75 days ;
8) Ground Floor & First
Floor Tile, Electrical & Painting work 60 days;
Appendix 3 – Scope and
Specification of the work
SPECIFICATION – 1 |
||
Nature of Work |
File Foundation |
Remarks |
Foundation |
Isolated footing
Foundation |
M-20 Minimum |
Car Parking |
1’-6” height from
road level. |
|
Basement height |
3’-0” height from
road level. For additional basement, height will be charged. |
|
RCC Column |
M-20 Minimum |
|
Roof |
Roof slab height
10’-6” Roof thickness 5” |
M-20 |
Brand Name of Cement |
Coromandel (or) Chettinad
Cement |
|
Steel |
TMT Bars FE 500/Ars
brand refer-structural drawing by architect. |
|
SPECIFICATION-2 |
||
Nature of Work |
Brick &
Plastering work |
Remarks |
Nature of Material |
Locally available
chamber bricks |
1:5 & 1:4 (Ratio) |
Wall thickness |
9” outer wall &
4½” Partition wall. |
M-sand |
Ratio of Cement /
Sand |
Cement plastering - 1:4 Inner wall plastering
- 1:5 Outer wall plastering
- 1:6 |
River Sand |
SPECIFICATION - 3 |
||
Nature of Work |
Flooring |
Remarks |
Flooring (Living /
Bedroom) |
Flooring vitrified
tiles 2 x 2 (Rs.50/- per Sq.ft.). Skirting of 4” height will be provided. |
|
Base Mortar |
Cement & Sand
Ratio of 1:6 |
|
Bathroom flooring |
Flooring and wall
tiles Rs.40/- per Sq.ft. (12” x 12”) |
|
Height of application |
7’-0” from floor
level. |
|
Wash area |
3” height (Rs.40/-
per Sq.ft.) |
|
Staircase |
Granite slab –
colour, pattern and size as specified
by Architect for risers and treads (basic Rate 100/Sft.) with stainless steel
handrail. |
|
SPECIFICATION - 4 |
||
Nature of Work |
Wood & Grill work |
Remarks |
Main Door & Lock |
1st Quality Gana Teak
(5”x3”) size with fixed (Basic rate Rs.4000/Cft.). Godrej cylinder lock approx. Rs.3,000/- |
|
Bedroom Door &
Lock |
Flush door maximum
Rs.140/- per Sft. & Godrej lock approx. Rs.1,500/- |
|
Bathroom door |
Waterproof door Flush
door maximum Rs.140/per Sft. |
|
Windows |
2nd Quality Gana teak Rs.1,800/Cft. Frame Size- 3” x 4” Shutter Size- 3” x
1.5” |
|
Place of application |
Windows |
|
Type of Material |
Square rods (12 mm) |
|
Nature of Painting |
Enamel (Asian Paint) |
|
SPECIFICATION – 5 |
||
Nature of Work |
Water Line Pipes |
Remarks |
Place of application |
Bathroom, Water Tank,
Wash Basin, Well to O.H.T. |
|
Type of Material |
C.P.V.C. ISI
(Ashirwad, Prince) |
|
Nature of Painting |
Enamel (Asian Paint) |
|
Kitchen Sink (SS) |
Rate 2,500/- |
|
SPECIFICATION – 6 |
||
Nature of Work |
Sewage Pipes |
|
Place of application |
Waste line from bath
& E.W.C. Wash Basin. (Rs.1,000/-) |
|
Type of Material |
PVC ISI |
|
CP Tap |
3 Nos. (Parryware brand
continental) |
|
Shower (2 in 1) |
1 No. (Parryware brand
continental) |
|
Wash Basin |
1 No. (Parryware brand
continental) |
|
Wall Mixer |
1 No. (Parryware brand
continental) |
|
Closets |
Parryware (White) |
|
SPECIFICATION - 7 |
||
Nature of Work |
Electrical & Wire
& Switches |
|
Type of conduit |
Concealed |
|
Size of Pipe |
1” & ¾” |
|
Switch Box |
Metal box for
junction |
|
Switches |
MK (OR) ROMA |
|
Wire & Cables |
Finolex & Kundan
& Orbit |
|
SPECIFICATION - 8 |
||
Nature of Work |
Painting & Colour
Washing |
|
Exterior wall |
One coat of white
wash & one coat Primer, 2 coat ACE Paint. |
|
Front side |
Asian ACE Emulsion
Paint two coat, one coat primer. |
|
Interior Wall |
2 coat Asian wall
putty one coat wall primer & 2 coat Premier emulsion. |
|
Frames & Grills |
One coat Primer two
coat of enamel. |
|
Nature of Brand |
Asian Paints |
|
SPECIFICATION - 9 |
||
Nature of Work |
Miscellaneous |
|
Platform counters
slab |
Kitchen – G20 Black
Granite counter slab. (Rs.130/-per Sq.ft.) |
20mm thickness |
Kitchen wall Tile |
Tiles will be
provided upto 2’- 0” height above kitchen level top (Rs.50/- per sq.ft) |
|
The following are the basic prices of materials considered in
this agreement, any escalation in the prices would be charged extra on the differential
amount
xxxxxx cement:
xxxxxx cement:
msand:
River sand:
Brick:
20mm blue material:
Filling Soil:
Steel/Tmt bar:
Rmc
M20:
M25:
Appendix 4 – Plans and Designs per the drawings
of the Architect:
[To be annexed once the same is made
ready]
The amount used in the article is for example purposes. it will vary according the zones of the country and the timeline
4 Common Types of Construction Contracts
good.Brilliant
ReplyDeleteAt the point when we choose to purchase an air conditioner, yet there are sure things you should deal with at the hour of purchasing an air conditioner.
ReplyDeletepanasonic repairs melbourne
Air conditioning systems are designed to operate quietly for minimal disruption.
ReplyDeleteair conditioning contractor Rockhampton
Drip edges are installed along the edge of a roof to direct water away from the structure.
ReplyDeleteRoofingClarity.com
Adding a fresh layer of paint to your kitchen cabinets can give them a new lease on life.
ReplyDeleteunclog drain
Drywall is like a blank canvas – ready for your artistic touch. Oregon
ReplyDeleteOn this page, you'll see my profile, please read this information. rengøring
ReplyDeleteThis guide on construction agreements between owners and contractors is incredibly informative! It's a must-read for anyone entering into a building project to ensure clear and fair terms. ARW
ReplyDeleteIt's crucial to ensure that all aspects of the project, like timelines, payment terms, and contractor responsibilities, are clearly outlined in the construction contract. This helps prevent misunderstandings and sassa status check banking details protects both parties throughout the project. A well-drafted contract is key to a smooth construction process.
ReplyDeleteAwesome work thanks for sharing this FintechZoom with us.
ReplyDelete